(310) 453-2397

HVAC Design & Installation

Mary Star High School

This Broadway Industries project consisted of installing a new air conditioning system for a two-story, 37,000 square feet, classroom and administration building. Additionally there is also a 10,000 sqare feet gym and locker facility. Broadway Industries installed all the air conditioning and ventilation systems for this facility, with a system redesign that saved $85,000 of initial costs.

Have an HVAC Design & Installation Project?

10 + 11 =

Experts in commercial heating, ventilation and air conditioning (HVAC) and Architectual & Sheet Metal

(310) 453-2397
contact@broadway-ind.com

License 870255 C-20/C-43